Machine installation considerations
|
Time:【2012-6-26】 Read a total of【
】Times 【 Font:Big In
Small 】【Print this page】
【Back】 |
1. Cleaning, sorting machine.
2. install the machine, please place the foot rubber pads and the machine placed in the air circulation, dry and clean place. Machine with split transport, according to the requirements of the split part of the assembled and connect the tubing, wires and a sense of isotherms.
3. joints and sliding at the heat resistance of lubricants.
4.Hydraulic oil # 46 of the senior cycle oil, the fuel tank to maintain 80 to 90 percent full.
5. detailed view of the various parts and accessories are fixed.
6, Machine rear logo properly into the machine with the outlet water pipes, water and gas source, pay attention to the inlet must make sure that the water pressure in the 2.5 ~ 5kgf/cm2.
7.Select the appropriate circuit breaker and wire in accordance with the size of the main switch of the machine, and confirm that the voltage specifications and really take a good grounding line to start the motor before the first selection switch to the manual position, then press the start switch to start the motor, should be immediately switch to stop position will be selected so that the motor is stopped, the reference motor arrows indicate the direction of rotation check test motor rotation is correct, if the direction is not correct, check the power supply phase sequence is correct? standard boot action necessary for a continuous period [start] [stop] movement after 3 to 5 times, began to produce action.
|
|
|
 |
|